![](https://www.pe-wi.com/wp-admin/admin-ajax.php?action=kernel&p=image&src=%7B%22file%22%3A%22wp-content%2Fuploads%2F2017%2F05%2F20131114_110115.jpg%22%2C%22thumbnail%22%3A%22%2C%22%7D&hash=3723064f)
Bearskin State Park Trail North Segment (11J1S & 13J2P)
Professional Engineering prepared the plans and specifications for this project which linked the Bearskin Trail and the Hiawatha trails together into one trail. Approximately 3 miles of the existing trail was in poor condition and needed to be resurfaced. In addition, the trail was connection at Old Hwy K was unsafe. Professional Engineering redesigned the trail so that it aligned with the existing trail on the north side of the road.